Ideal for energy assessors with low or uncertain workloads
How it works:
-
When a calculation is performed to a project credits are deducted from the users account.
-
If the required amount of the credits has been already deducted, the user can run several calculations of the same project without deducting credits.
-
Project description and address details cannot be access after the calculation.
-
Project calculation expires in 30 days after a credit has been applied to the project.
-
Credits are deducted based on the total area of the spaces in the building model.
For example: An EPC energy study with total spaces area 200 m2 requires 200 credits.